top of page
DATA CENTER CONSTRUCTION REGULATION
Data Center Regulations
All Data Center Construction, operation, and location designation shall adhere to the following provisions.
Land allocated to Data Center Construction, parking, etc. shall not use ariable farm land
Data Centers shall be built to utilize Renewable Forms of energy, and at no time shall cooling technologies utilize the public water supply
Data Centers shall not use Fossil Fuel technologies, of any kind, to generate power for operation, including but not limited to Propane Generators
Data Centers shall not integrate with any existing electrical grids, and should be self contained
Any costs incurred by Data Centers cannot, under any circumstances be pushed to the public to pay for, or result in increasing costs for public utilities in any capacity
bottom of page
